| Contract name | Level of Documentation | Investor | Year |
|---|---|---|---|
| THE CAPACITY BOOST OF GRINDING LINE FOR PM18 | detailed implementation project | MONDI SCP a.s. | 2021 |
| TRANSPORTATION OF WASTEWATER FROM THE SWIMMING POOL TO THE CHEMICAL SEWERAGE | detailed implementation project | MONDI SCP a.s. | 2021 |
| NEW TISSUE LINE TL9 | construction project for building permit | SHP Harmanec, a. s. | 2021 |
| PROJEKT ECO PLUS V MONDI SCP, a.s. Zmena stavby pred dokončením |
construction project for building permit | MONDI SCP a.s. | 2020 |
| New exchanger C_38_E_028 | detailed implementation project | MONDI SCP a.s. | 2020 |
| New chopper for chip sorter | detailed implementation project | MONDI SCP a.s. | 2020 |
| New tanks for PM1 | study | MONDI SCP a.s. | 2020 |
| Measuring frames for PS16 - MONDI SCP a.s. | detailed implementation project | HONEYWELL HPS, s.r.o. | 2020 |
| NEW MILLS ON PM18 | study | MONDI SCP a.s. | 2020 |
| Reinstallation of Kufferath | study | MONDI SCP a.s. | 2020 |
| Pulping for PM18 | study | MONDI SCP a.s. | 2019 |
| Cross-connection of black liquor from 60_T_917 to the new MVR | detailed implementation project | MONDI SCP a.s. | 2019 |
| ECO plus project in Mondi SCP a.s., Ružomberok - Consultations for the PM19 project | technical support | MONDI SCP a.s. | 2019 |
| Pumping of liquid from PM 38 | detailed implementation project | MONDI SCP a.s. | 2019 |
| New exchanger for water heating in the bleach tower | technical support | MONDI SCP a.s. | 2019 |
| New pumps 33-302, 33-303 | detailed implementation project | MONDI SCP a.s. | 2019 |
| PS 18 POPE_Sprayers project | detailed implementation project | MONDI SCP a.s. | 2019 |
| Replacement of lime sediment mixer on Mondi SCP a.s | detailed implementation project | AXFLOW s.r.o. | 2019 |
| Detailed engineering of process pumps | detailed implementation project | MONDI SCP a.s. | 2019 |
| Third pulp route on PM 18 | detailed implementation project | MONDI SCP a.s. | 2019 |
| Emergency sump under the hydraulic unit PS1 | detailed implementation project | MONDI SCP a.s. | 2019 |
| Overhaul of the roof of the bleach tower | construction project for building permit | BUKOCEL a.s. | 2019 |
| Replacement of blow-tank stirrers 32-100 and 33-101 | detailed implementation project | MONDI SCP a.s. | 2019 |
| PM16 water tank replacement | detailed implementation project | MONDI SCP a.s. | 2019 |
| The use of excess water from cooling of hydraulic washing machine units | detailed implementation project | MONDI SCP a.s. | 2019 |
| Piping - POPE winder - PM18 | detailed implementation project | MONDI SCP a.s. | 2019 |
| Air distribution - PM18 | detailed implementation project | MONDI SCP a.s. | 2019 |
| PROJEKT ECO PLUS V MONDI SCP, a.s. documentation for the zoning decision |
documentation for the zoning decision | MONDI SCP a.s. | 2019 |
| New pump 33-018 | detailed implementation project | MONDI SCP a.s. | 2019 |
| ECO PLUS – PROJECT 2000 – Cooking a Fiberline | detailed implementation project | MONDI SCP a.s. | 2018 |
| New NL20 grinding machine | construction project for building permit | SHP Slavošovce | 2018 |
| Pumping pulp into the tank - PS18 | technical support | MONDI SCP a.s. | 2018 |
| Loading paper into the drying section of the PM17 | detailed implementation project | MONDI SCP a.s. | 2018 |
| Measuring frames for PM17 - Mondi SCP | detailed implementation project | HONEYWELL, s.r.o. | 2018 |
| Controlled dosing of chips between the storage silo and the belt conveyor 18_E_027 | study | MONDI SCP a.s. | 2018 |
| New chip warehouse | technical support | MONDI SCP a.s. | 2018 |
| Increased security on the PM16 gluing press | detailed implementation project | MONDI SCP a.s. | 2018 |
| Modernization of the washing process | construction project for building permit | MONDI SCP a.s. | 2018 |
| Assessment of FL pumps condition | technical support | MONDI SCP a.s. | 2018 |
| PM18 problem with water dilution | detailed implementation project | MONDI SCP a.s. | 2017 |
| New DNCG and CNCG VL condensers | detailed implementation project | MONDI SCP a.s. | 2017 |
| Reel warehouse OJ CU - ALT. 1.2 | study | MONDI SCP a.s. | 2017 |
| VL - New black liquor filter | detailed implementation project | MONDI SCP a.s. | 2017 |
| Estimation of investment costs for troubleshooting of the steam condensing system | study | MONDI SCP a.s. | 2017 |
| Estimation of investment costs for the installation of manual shut-off valves | study | MONDI SCP a.s. | 2017 |
| Grinder installation on PM18 | detailed implementation project | MONDI SCP a.s. | 2017 |
| Project 2000 - FIBERLINE - Cost estimation + preliminary time plan | technical support | MONDI SCP a.s. | 2017 |
| Extension of the sequence by two washing units | technical support | MONDI SCP a.s. | 2017 |
| Replacement of gram valve PM1 | detailed implementation project | MONDI SCP a.s. | 2017 |
| PS1 vacuum system optimization | detailed implementation project | MONDI SCP a.s. | 2017 |
| Cylinder warehouse OJ CU - ALT. 2, ALT 3 | study | MONDI SCP a.s. | 2017 |
| New grinding line PS1 - technology | detailed implementation project | MONDI SCP a.s. | 2017 |
| PM17 rope-free boot | detailed implementation project | MONDI SCP a.s. | 2017 |
| Operator-free deployment of POPE PM18 | detailed implementation project | MONDI SCP a.s. | 2017 |
| Turbo Blower Runtech installation | detailed implementation project | BUKOCEL a.s. | 2017 |
| New scrubber - second circuit | detailed implementation project | MONDI SCP a.s. | 2017 |
| Static reinforcement of the VS building | detailed implementation project | MONDI SCP a.s. | 2016 |
| New AK-4 pressure sorter | detailed implementation project | BUKOCEL a.s. | 2016 |
| Heat exchanger replacement for ASA | detailed implementation project | MONDI SCP a.s. | 2016 |
| Bleach tower optimization | detailed implementation project | BUKOCEL a.s. | 2016 |
| ECO plus project in Mondi SCP a.s., Ružomberok | documentation for the zoning decision | MONDI SCP a.s. | 2016 |
| ECO plus project in Mondi SCP a.s., Ružomberok | construction project for building permit | AF-Consult Czech Republic, s.r.o. | 2016 |
| Cellulose machine power increase - steam box | detailed implementation project | BUKOCEL a.s. | 2016 |
| Reconstruction of the DNCG system on the fiber ine and regeneration | study | MONDI SCP a.s. | 2016 |
| New printing machine - Solo Packaging | study | MONDI SCP a.s. | 2016 |
| Project 2000 – Drying machine, Engineering fiberline, Regausticizing | detailed implementation project | MONDI SCP a.s. | 2016 |
| Moving NL16 to the position of the disassembled NL20 grinding machine | construction project for building permit | SHP Slavošovce | 2016 |
| PROJECT 2000 IN MONDI SCP, a.s. Ružomberok | building permit | MONDI SCP a.s. | 2016 |
| PROJECT 2000 IN MONDI SCP, a.s. Ružomberok | documentation for the zoning decision | MONDI SCP a.s. | 2016 |
| Bleach tower roof repair overhaul | detailed implementation project | BUKOCEL a.s. | 2016 |
| Reconstruction of the press part of PM17 | detailed implementation project | MONDI SCP a.s. | 2015 |
| Fiber line pumps conversion | technical support | MONDI SCP a.s. | 2014 |
| Reconstruction of the drying machine press part | study | MONDI SCP a.s. | 2014 |
| Drying machine steam condensing system reconstruction | study | MONDI SCP a.s. | 2013 |
| Drying machine vacuum system installation | study | MONDI SCP a.s. | 2013 |
| PM1 reconstruction | technical support | MONDI SCP a.s. | 2013 |
| Reconstruction of PM17 and new rewinder | technical support | MONDI SCP a.s. | 2013 |
| Installation of turboblowers for the PM18 vacuum system | detailed implementation project | MONDI SCP a.s. | 2013 |
| PM18 VACUUM SYSTEM OPTIMIZATION | study | MONDI SCP a.s. | 2012 |
| PM17 refineries | technical support | MONDI SCP a.s. | 2012 |
| Processing line NL 18 - SHP Slavošovce | building permit | PROMA s.r.o. | 2010 |
| Paper production in rich colors UPP - SHP Slavošovce | detailed implementation project | PROMA s.r.o. | 2009 |
| Packaging line | detailed implementation project | BUKOCEL a.s. | 2008 |
| NL 17 - SHP Slavošovce | building permit | SHP Slavošovce | 2008 |
| Sawmill and pallet production line relocation | building permit | MONDI SCP a.s. | 2008 |
| Transport and storage of wood waste system | building permit | SMREČINA HOFATEX, a.s. | 2008 |
| Extrusion relocation | building permit | MONDI SCP a.s. | 2008 |
| Printing relocation | building permit | MONDI SCP a.s. | 2008 |
| BLEACH TOWER RECONSTRUCTION FOR THE PRODUCTION OF ECF PULP | detailed implementation project | BUKOCEL a.s. | 2008 |
| PULP DRYING IN BUKOCEL a.s. | study | BUKOCEL a.s. | 2008 |
| REFINER EXTENSION PROJECT | detailed implementation project | MONDI SCP a.s. | 2008 |
| Bleaching pre – engineering | Pre - engineering | Mondi business paper SCP a.s. Ružomberok | 2006 |
| Cooking pre – engineering | Pre - engineering | Mondi business paper SCP a.s. Ružomberok | 2006 |
| Toilet paper production line | Project permision, Detail engineering | SHP Slavošovce | 2006 |
| Compressor station reconstruction | Detail engineering - elektro + ASRTP | Mondi business paper SCP a.s. Ružomberok | 2006 |
| Packaging line | Detail engineering | Mondi business paper SCP a.s. Ružomberok | 2006 |
| Vacuum station | Detail engineering | Mondi business paper Štětí | 2006 |
| PM6 upgrade | Project permision | Mondi business paper SCP a.s. Ružomberok | 2006 |
| PM6 constant part | Detail engineering | JIP Papírny a.s. Větřní | 2006 |
| Debottlenecking | Detail engineering | Mondi business paper SCP a.s. Ružomberok | 2006 |
| Paper machine | Project permision | Obalové materiály Snina | 2006 |
| ECF pulps production | Detail engineering | Bukocel Vranov n/T | 2006 |
| Ligatne - Latvia paper machine | Detail engineering | Papcel Litovel a.s. | 2006 |
| Paper machine for the production of 5 t / h - Almaty Kazakhstan | detailed implementation project | Papcel Litovel a.s. | 2005 |
| Fiber line, evaporator, erewery, drying machine assessment | Base analysis | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Disc pack relocation | detailed implementation project | OBALY SÓLO | 2005 |
| PULP MILL SW Reclaimer | building permit, detailed implementation project, authorised supervision | Mondi business paper SCP a.s. Ružomberok | 2005 |
| New line for the material preparation of Ligatne Latvia | detailed implementation project | Papcel Litovel a.s. | 2005 |
| Paper machine for the production of 5 t / h -Almaty Kazakhstan | detailed implementation project | Papcel a.s. Litovel | 2005 |
| New compressor station | detailed implementation project | Obaly SOLO | 2005 |
| Detailed engineering for Debottlenecking | technical support, Realizačné projekty | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Technical study of SHP long-term development | study | SHP Harmanec a.s. | 2005 |
| NL napkin machine with six-color printing | tier 1 project | SHP Slavošovce | 2005 |
| Building permit project documentation for evaporator, causticization, wood warehouse, new regenration boiler, fiber line | building permit | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Decorative stamping on TL 2 SHP | tier 1 project | SHP Harmanec a.s. | 2005 |
| PM18 sieve trimming device | detailed implementation project | SHP Harmanec a.s. | 2005 |
| TP production line | Realization project | Tento a.s. Žilina | 2005 |
| Pumping of pulped cellulose to PM 18 | Realization project | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Stability of paper path PS2 | Realization project | Tento a.s. Žilina | 2005 |
| Impulse project – Fibre line - by pass II. | Realization project | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Tapping and transport of starch for PM 17, PM 18 | Detail engineering | NSCP, a.s. Ružomberok | 2004 |
| Projekt IMPULS - Pulp mill – Fibre line | Detail engineering | NSCP, a.s. Ružomberok | 2004 |
| Projekt IMPULS - Reconstruction PM 18 and winder | Detail engineering | NSCP, a.s. Ružomberok | 2004 |
| IMPULSE projekt – Pulp Mill Fibre line | Project permision | NSCP a.s. Ružomberok | 2004 |
| Reconstruction of waste paper | Detail engineering | KAPPA, a.s. Štúrovo | 2004 |
| Projekt IMPULS - Pulp mill – Fibre line | Detail engineering | NSCP a.s. Ružomberok | 2003 |
| Steam and condensate system for PM 16 | Detail engineering | NSCP, a.s. Ružomberok | 2003 |
| Rebuild PM 18 | Project permision,Detail engineering - for civil part | NSCP, a.s. Ružomberok | 2003 |
| Reconstruction PM 1 | Project permision, Detail engineering | SCP, a.s. Ružomberok | 2002 |
| PM 1 - Reconstruction | Complette project dokumentation, Building + Executive project | MONDI SCP a.s. | 1996-1997 |
| Autom. process control systems - bleaching plant optimization | Project permision, Detail engineering | Bukóza Vranov | 1996 |
| Production and palletization of small sizes at PM 6 | Complette project dokumentation | MONDI SCP a.s. | 1995 |
| Displacement cooking | Project permision, Detail engineering | MONDI SCP a.s. | 1995 |
| Production and warehousine of small sizes at PM 8 | Complette project dokumentation | MONDI SCP a.s. | 1994 |
| PM 8 - Reconstruction | Complette project dokumentation | Slavošovské papierne | 1993 |
| PM No. 2 - Tisssue | Project permision | Tento, a.s. Žilina | 1993 |
| Leykam Rakúsko | Detail engineering | MONDI SCP a.s. | 1993 |
| Oxygen bleaching | Complette project dokumentation | MONDI SCP a.s. | 1992 |
| Contract name | Level of Documentation | Investor | Year |
|---|---|---|---|
| Exhaust fan replacement - regeneration | study | MONDI SCP a.s. | 2020 |
| Air heaters steam system | detailed implementation project | MONDI SCP a.s. | 2020 |
| Pipe heating from RK2 and RK3 | detailed implementation project | MONDI SCP a.s. | 2020 |
| Modernization project of sector nr. 6 Water treatment adjustment |
detailed implementation project | SAM - SHIPBUILDING AND MACHINERY a.s. |
2020 |
| Flue gas fan replacement | detailed implementation project | MONDI SCP a.s. | 2020 |
| RB3 HVAC UPGRADE | detailed implementation project | MONDI SCP a.s. | 2020 |
| UPGRADE DNCG | detailed implementation project | MONDI SCP a.s. | 2020 |
| COOLING TOWERS | construction project for building permit | SAM - SHIPBUILDING AND MACHINERY a.s. |
2020 |
| AIR CANNONS FGC | technical support | MONDI SCP a.s. | 2020 |
| RK3 SCHEMES UPDATE | projekt skutočného vyhotovenia | MONDI SCP a.s. | 2020 |
| New compressor 7000 m3 / hour | detailed implementation project | MONDI SCP a.s. | 2019 |
| ECO PLUS PROJECT New biogas route |
detailed implementation project | MONDI SCP a.s. | 2019 |
| PRODUCTION OF ECO-FUELS - PELLET LINE BANSKÁ BYSTRICA | construction project for building permit | TATRAS, s.r.o. | 2018 |
| New EO RK3 incl. AMS RK3 | construction project for building permit | BUKOCEL a.s. | 2018 |
| KDO steam injection valves | detailed implementation project | MONDI SCP a.s. | 2018 |
| Recovery of secondary biological sediment into a product with higher added value | construction project for building permit | BUKOCEL a.s. | 2018 |
| ECO PLUS PROJECT IN MONDI SCP, a.s. - COOLING TOWER PART |
detailed implementation project | MONDI SCP a.s. | 2017 |
| Energy optimization | detailed implementation project | MONDI SCP a.s. | 2017 |
| Cooling water jet after turbines TG1, TG2 | detailed implementation project | MONDI SCP a.s. | 2017 |
| Thermal utilization of boiled condensate | detailed implementation project | MONDI SCP a.s. | 2017 |
| Reduction of emissions on RK2 - New ESP | detailed implementation project | MONDI SCP a.s. | 2017 |
| Energy optimization RB3 | detailed implementation project | MONDI SCP a.s. | 2017 |
| Modernization of K1 dumps - Extension of RS and addition of PRS | detailed implementation project | BUKOCEL a.s. | 2016 |
| PM 19 WATER COOLING | technical support | MONDI SCP a.s. | 2016 |
| Shut-off valves and relevant pipelines installation - NPP Mochovce | detailed implementation project | SAM s.r.o. | 2016 |
| Buildings heating gauging in Mondi SCP, a.s. | detailed implementation project | MONDI SCP a.s. | 2016 |
| RK3 ash potassium removal | technical support | MONDI SCP a.s. | 2016 |
| New Decanter | detailed implementation project | MONDI SCP a.s. | 2016 |
| Additive economy K1 | detailed implementation project | Bukóza Energo, a.s. | 2016 |
| New combustion furnace for non-condensible gases replacement disposal | detailed implementation project | MONDI SCP a.s. | 2016 |
| New combustion furnace for non-condensible gases replacement disposal | building permit | MONDI SCP a.s. | 2016 |
| NCG disposal simplification | study | MONDI SCP a.s. | 2015 |
| Lime kiln flue gas use of heat | technical support | MONDI SCP a.s. | 2015 |
| Lime kiln flue gas use of heat | building permit, detailed implementation project | MONDI SCP a.s. | 2015 |
| Reconstruction of K1 boiler | building permit | Bukóza Energo, a.s. | 2015 |
| Auxiliary pumps and motors reconstruction in CS 224 with LV in PS 4 Tupá | TRANSPETROL a.s. | 2015 | |
| TG8 Virtual sector | technical support | MONDI SCP a.s. | 2014 |
| RB3 project - evaporator, VTR and HD towers | detailed implementation project | MONDI SCP a.s. | 2014 |
| RB3 project - evaporator, VTR and HD towers | building permit | MONDI SCP a.s. | 2014 |
| The use of waste heat from the dryer for the needs of heating TESLA I complex | study | RETTENMEIER TT | 2013 |
| Treatment and energy recovery of sediment from industrial wastewater treatment Mondi SCP | building permit, detailed implementation project | MONDI SCP a.s. | 2010 |
| Budget costs estimate for new RK and evaporator reconstruction | study | MONDI SCP a.s. | 2010 |
| Heat recovery from SK1 and SK2 flue gas boilers | building permit, detailed implementation project | MONDI SCP a.s. | 2010 |
| Industrial wastewater sediment treatment and energy recovery in Mondi SCP | study | MONDI SCP a.s. | 2010 |
| The use of hot water modernization - Hot Water Handling | building permit, detailed implementation project | MONDI SCP a.s. | 2010 |
| Heat accumulation | Study | Bukocel a.s. Vranov n/T | 2006 |
| Power engineering Levice | Detail engineering-elektro | Energetika Levice | 2006 |
| Wood waste boiler reconstruction | Project permision | Mondi business paper SCP a.s. Ružomberok | 2006 |
| Steam accumulator installation | study | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Wood waste boiler reconstruction | building permit | Mondi business paper SCP a.s. Ružomberok | 2005 |
| CO2 reduction of emissions via regeneration boiler | detailed implementation project stav. časti | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Heat management reconstruction, stage III, Turzovka | building permit | Energetika Turzovka | 2005 |
| New steam accumulator | Technical support | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Reconstruction of Bark boiler | Project permision | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Contract name | Level of Documentation | Investor | Year |
|---|---|---|---|
| White sediment tank | detailed implementation project | MONDI SCP a.s. | 2021 |
| Capacity production expansion of precipitated calcium carbonate | detailed implementation project | Specialty Minerals Slovakia s.r.o. | 2020 |
| Oxygen pipeline in MONDI SCP a.s. Ružomberok | detailed implementation project | LINDE Gas a.s. | 2020 |
| Nitrogen pipeline in MONDI SCP a.s. Ružomberok | detailed implementation project | LINDE GAS s.r.o. | 2020 |
| New ClO2 absorption tower | documentation for the zoning decision | MONDI SCP a.s. | 2020 |
| New ClO2 absorption tower | construction project for building permit | MONDI SCP a.s. | 2020 |
| New ClO2 absorption tower | detailed implementation project | MONDI SCP a.s. | 2020 |
| ECO PLUS PROJECT NEW METANOL ROUTE |
detailed implementation project | MONDI SCP a.s. | 2020 |
| WASHING NH3 AND TZL FROM CYCLONE | construction project for building permit | SAM - SHIPBUILDING AND MACHINERY a.s. |
2020 |
| WASHING NH3 AND TZL FROM CYCLONE | detailed implementation project | SAM - SHIPBUILDING AND MACHINERY a.s. |
2020 |
| LINDE building | construction project for building permit | MONDI SCP a.s. | 2019 |
| Linde Building - Mondi SCP, a.s. | documentation for the zoning decision | MONDI SCP a.s. | 2019 |
| Linde Building - Mondi SCP, a.s. | construction project for building permit | MONDI SCP a.s. | 2019 |
| Temporary delivery solution O3 | detailed implementation project | MONDI SCP a.s. | 2019 |
| Improving ClO2 emissions | technical support | MONDI SCP a.s. | 2019 |
| Production expansion of precipitated calcium carbonate | documentation for the zoning decision | Specialty Minerals Slovakia s.r.o. | 2019 |
| Production expansion of precipitated calcium carbonate | construction project for building permit | Specialty Minerals Slovakia s.r.o. | 2019 |
| Use of heat from PM1 turboblowers | technical support | MONDI SCP a.s. | 2019 |
| Fiber line NaOH dosing | detailed implementation project | MONDI SCP a.s. | 2019 |
| Cooler VL Carrier replacement | detailed implementation project | MONDI SCP a.s. | 2018 |
| Relocation of hydrogen peroxide storage tanks | detailed implementation project | MONDI SCP a.s. | 2018 |
| CO2 supplies for SMI | technical support | MONDI SCP a.s. | 2018 |
| Warehouse of liquid chemicals WTP Hrboltová | detailed implementation project | MONDI SCP a.s. | 2017 |
| New OZP tank on PM17 | detailed implementation project | MONDI SCP a.s. | 2017 |
| Elements process optimization of the system of alkaline scheme | detailed implementation project | MONDI SCP a.s. | 2017 |
| Equipment modernization - replacement of gas scrubber | detailed implementation project | MONDI SCP a.s. | 2017 |
| Reconstruction of the evaporator Bukóza Vranov Upgrade of the vacuum evaporator | construction project for building permit | BUKOCEL a.s. | 2016 |
| Soap tank, regeneration | detailed implementation project | MONDI SCP a.s. | 2016 |
| Bottling and storage of C₂H₄O₃ | detailed implementation project | KEMIRA s.r.o. | 2016 |
| New lime storage silo - regeneration | technical support | MONDI SCP a.s. | 2016 |
| Bottling and storage of Blankophor - PM18 | detailed implementation project | MONDI SCP a.s. | 2016 |
| Vacuum evaporator modernization | building permit | BUKOCEL a.s. | 2016 |
| Dihydroquercetin and arabinogalactan plant (Flavit) | technical support | Fortischem a.s. | 2012 |
| Lime kiln replacement | building permit | MONDI SCP a.s. | 2013 |
| Lime kiln replacement | study | MONDI SCP a.s. | 2012 |
| Reconstruction of vacuum sources in Unihale - Zentiva | detailed implementation project | NOVING NOVÁKY s.r.o. | 2012 |
| Increasing the energy efficiency of the pulp production process in Mondi SCP a.s. Ruzomberok - IEG | documentation for the zoning decision | MONDI SCP a.s. | 2011 |
| Production of steel cords - I. stage - BEKAERT | building permit, detailed implementation project | BEKAERT Sládkovičovo | 2010 |
| Reconstruction of mazut management ENO A and ENO B bl.3,4 | detailed implementation project | UNISTAV Prievidza a.s. | 2010 |
| Reconstruction of bleaching solutions preparation | detailed implementation project | BUKOCEL a.s. | 2010 |
| Fire extinguisher replacement | detailed implementation project | MONDI SCP a.s. | 2009 |
| Pre–engineering for lime kill | Pre-engineering | Mondi business paper SCP a.s. Ružomberok | 2006 |
| Biodiesel production Serbia | Detail engineering | OTEZA s.r.o. Martin | 2006 |
| Black liquor heater, regeneration boiler | detailed implementation project | Kappa Štúrovo a.s. | 2005 |
| Industrial and cooling water supply | detailed implementation project | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Waste water boil system | tier 1 project | Kapp Štúrovo a.s. | 2005 |
| Project IMPULS - Lime kiln and recausticizing plant | Supervision and built documentation | NSCP, a.s. Ružomberok | 2004 |
| Project IMPULS - pulp mill – EVAPORATOR | Project permision | NSCP, a.s. Ružomberok | 2003 |
| Project IMPULS - Lime kiln and recausticizing plant | Detail engineering | NSCP, a.s. Ružomberok | 2003 |
| Contract name | Level of Documentation | Investor | Year |
|---|---|---|---|
| Separator instead of sediment press | detailed implementation project | MONDI SCP a.s. | 2018 |
| Unification of container transport of sediment for WWTP Rojkov | construction project for building permit | Vodárenská spoločnosť Ružomberok, a.s. | 2018 |
| Unification of container transport of sewage sludge Liptovská Osada | construction project for building permit | Vodárenská spoločnosť Ružomberok, a.s. | 2018 |
| Sediment solids increase to RPV - CPR filter control | detailed implementation project | BUKOCEL a.s. | 2018 |
| Hot water utilization at DM | detailed implementation project | MONDI SCP a.s. | 2017 |
| New sediment press (centrifuge) at water station | study | MONDI SCP a.s. | 2017 |
| New pump for CHÚV | detailed implementation project | MONDI SCP a.s. | 2017 |
| Centrifuge at Hrboltová WWTP | detailed implementation project | MONDI SCP a.s. | 2017 |
| The increase of ventilation capacity of the WWTP | detailed implementation project | MONDI SCP a.s. | 2016 |
| The increase of the capacity of reverse sediment pumping in WWTP in Mondi SCP, a.s. | detailed implementation project | MONDI SCP a.s. | 2016 |
| Technological wastewater treatment | detailed implementation project | Bekaert Hlohovec a.s. | 2016 |
| Direct hot water cooling - WF cooler | detailed implementation project | MONDI SCP a.s. | 2016 |
| The increase of ventilation capacity of the WWTP (part of Project 2000) and the increase of the capacity of reverse sediment pumping for WWTP in Mondi SCP, a.s | building permit | MONDI SCP a.s. | 2016 |
| CHÚV3 renewal and modernization - Duslo Šala | detailed implementation project | DUSLO a.s. | 2015 |
| Competition increase of Baldovská trademark by implementing innovative technologies and technical transfers, part 2 - Technology of accumulation of mineral water and syrups in the Baldovce plant | detailed implementation project | Minerálne vody a.s. | 2015 |
| Gas scrubber with biofilter in the Hrboltová WWTP | construction project in the quantity of detailed implementation project | MONDI SCP a.s. | 2014 |
| Reconstruction and modernization of the Sokoľany WWTP | detailed implementation project | U.S. Steel Košice s.r.o. | 2013 |
| Water management technology modernization - ŽP, a.s. - Siemens, s.r.o. | Železiarne Podbrezová | 2013 | |
| Raw water Treatnebt and chemical Dosing - Mochovce | detailed implementation project | Slovenské elektrárne, a.s. | 2012 |
| Processed water circulation from coin plates production | building permit | AMERA SLOVAKIA KREMNICA, s.r.o. | 2012 |
| Reconstruction of WWTP Duslo, a.s., workplace Bratislava | building permit, detailed implementation project | DUSLO a.s. | 2011 |
| Reconstruction and modernization of Sokoľany WWTP | building permit | SIEMENS s.r.o. | 2011 |
| Filtration - Russia | SIEMENS s.r.o. | 2011 | |
| Ventilation of the Sokoľany WWTP level | US Steel / Siemens s.r.o. | 2011 | |
| The increase of the capacity of reverse sediment pumping in WWTP Hrboltová | study | MONDI SCP a.s. | 2010 |
| Mini steel plant in Strážske | detailed implementation project | SIEMENS s.r.o. | 2009 |
| Modernization of sediment management - SČOV Hrboltová | detailed implementation project | MONDI SCP a.s. | 2009 |
| Energy savings and fresh water storage tank | building permit | Mondi business paper SCP a.s. Ružomberok | 2005 |
| Reconstruction filter sandblast | Project permision | JE Mochovce | 2002 |